Yusuf Bachtiar - 15009001

Periode wisuda: 02 Juli 2012
Makalah: S1 Teknik Sipil
PERENCANAAN PELAKSANAAN KONSTRUKSI TOWER 3 DAN 4 GEDUNG RUSUNAWA ITB JATINANGOR
Construction project “Tower 3 and 4” is needed to build a new building. PU as owner wants earned value of construction project. Whish is need a good planning to gain it. construction planning and method is necessary One of them is construction planning. It has done before the construction begin,. The purpose of this thesis is to re-planning of the construction of Rusunawa ITB Jatinangor building, consisting of analysis of existing construction methods then plan the latest construction methods also create scheduling of construction activities and cash flow.This thesis is done using RKS documents, bill of quantity, a bar chart of the implementing agency, as well as documentation of construction by the implementing agency. Scheduling is done with the help of software Microsoft Project 2010 and determination of resource requirements such as manpower and equipment, is using SNI (Indonesian’s National Standards). Those scenario done by replacing the construction method of foundation with a single acting hammer to vibratory pile driven, use of pre-cast components for the superstructure, and the placement of existing resources without overalocation based on job requirements.